Welcome to visit us!

[email protected]
logo comp4

Milling Rate On Pavement

Production rate 100 to 200 tonshr for large machines depends on machine and pavement conditionsaterial size after milling 95 passing the 50 mm 2inch sieve typical sizemilling machinefter a pavement has been milled the resulting surface is quite dirty and dustyhe surface should be cleaned off by sweeping or washing before.

Copyright© 2018 TENIC machinery.All rights reserved. Sitemap